Bathroom renovations

Bathroom renovations in Central Scotland

From strip-out to the last bead of silicone, we handle the whole room ourselves: removal, first-fix plumbing, boarding, tiling, lighting niches, sanitaryware and brassware. One team, one quote, and a finish worth showing off.

Renovated shower room with brushed copper wall-mounted tap, pebble mirror and lit shower niche
Copper & stone shower roomBathroom

How it runs

Five stages, one team

Project

Copper shower room

A full strip-out and rebuild with brushed copper brassware, a lit shower niche, stone-effect tiles and a walk-in enclosure. Copper runs through the taps, flush plate and towel radiator so the room reads as one piece.

  • Brushed copper wall-mounted brassware
  • LED-lit shower niche
  • Back-to-wall WC with copper flush plate
  • Copper heated towel radiator
Copper bathroom with back-to-wall toilet, copper flush plate and underlit vanity
WC & vanityCopper
Brushed copper shower handset and lit niche in a stone-effect shower
Lit nicheCopper
Brushed copper heated towel radiator in a tiled shower room
Towel radiatorCopper

Project

Gold & marble bathroom

Marble-effect porcelain, a backlit fluted feature wall, a round LED mirror, a wall-hung toilet and brushed gold throughout. The lighting is built into the walls, so the room glows without a single visible fitting.

  • Large-format marble-effect porcelain
  • Backlit fluted feature panel
  • Round illuminated mirror
  • Wall-hung WC on a concealed frame
Marble-effect bathroom with brushed gold fittings, round LED mirror and fluted backlit panel
Mirror & panelGold
Brushed gold shower tower panel beside a backlit fluted shower niche
Shower towerGold
Round illuminated mirror with gold frame above a wall-mounted gold basin tap
BasinGold

Included

Everything in one quote

  • Strip-out and disposal
  • First-fix plumbing and concealed frames
  • Boarding and waterproofing
  • Wall and floor tiling
  • Lit niches and feature lighting
  • Sanitaryware, brassware and towel radiators
  • Final fix, testing and silicone

Planning a new bathroom?

Send us a few photos of the room as it is now and any ideas you’ve saved. We’ll talk it through and arrange a visit.

FAQ

Questions

Can’t see yours? Message us on WhatsApp and we’ll reply as soon as we’re off the tools.

How long does a bathroom renovation take?

Most bathroom renovations take between one and three weeks depending on the size of the room, layout changes and tiling. You get a timeline with your quote.

Do you handle the whole job?

Yes. Removal, first-fix plumbing, boarding, tiling, lighting niches, sanitaryware and brassware are all handled by one team, so nothing falls between trades and you have one quote and one point of contact.

Do you take on bathroom projects outside Lanarkshire?

Yes. Bathroom renovations are planned work, so we take them on across Central Scotland, from Glasgow and Paisley to Livingston and Edinburgh, and further afield for the right project.